Solartricity

Solartricity

Declaration Of Works - Paperwork Generator

Welcome to the Solartricity Declaration Of Works Paperwork Generator

Generate the required paperwork for your installation

To use this website, you are required to enter the details of the installer and client so that the form can be completed.
On completion, your paperwork will be downloaded as a pdf file and stored in your 'Downloads' folder. Please note Solartricity do not retain copies.

In using this website, you agree to the use of your data by Solartricity.

This site can use cookies to store your information on your computer so that you don't need to fill in your details everytime that you use it.

You have previously given your consent.

If you no longer agree to the use of cookies, click here

Check here to agree to the use of cookies

If you prefer not to, you can still use this paperwork generator without agreeing to cookies.

Document Select

You can choose from three types of document -

  • SEAI Grant Domestic - for domestic installations availing of the SEAI grant scheme
  • SEAI Grant Non - Domestic - for non-domestic installations availing of the SEAI grant scheme
  • Non-Grant - for installations not availing of the SEAI grant scheme
  • Agrement - for installations that comply with Solartricity Agrement Certification

Please select -

System Details

Please select the item installed from the dropdown lists and enter a quantity where required.

Solar PV Panels

 
Enter Total Number of Panels  

Inverters

Inverter 1
Inverter 2 (if applicable)
Inverter 3 (if applicable)

Solar Inverter

Options -    

Solar Inverter

Up to three combinations of inverter can be selected.
Leave quantity at zero if not required.

Inverter 1 -    

Inverter 2 -    

Inverter 3 -    

Battery Storage - select None if not required

Options -    

Meter Select - select None if not required

Options -  

Mounting Select

Options -  

Meter Select

Options -  

Production Estimation

You are required to submit an Estimation Of Production report. You can use our report using the DEAP calculation by clicking "DEAP". Or you can enter your own values into the boxes below and the link in 'Additional'.

Please enter the required information -
Solar PV Annual Estimated Yield
AC kWh based on estimated calculation
Method of Calculation
(e.g. PVSyst)

Hot Water Diverter

Is a Hot Water Diverter Installed ?
   

Installer Details

Please enter your details as applicable


Solar PV Registered Company Details

must be on SEAI Solar PV COMPANY Register
Company
ID Number

Solar PV Registered Installer Details

must be on SEAI Solar PV INSTALLER Register
Installer Company
Installer Name
Address Line 1
Address Line 2
Town / City
County
Eircode

Solar PV Company Details

Company
Contact
Address Line 1
Address Line 2
Town / City
County
Eircode

SEAI Requirements

Items indicated with *can be left blank, but must be completed.
Electrical Certs.
Safe Electric Certificate
Serial Number
*
Test Record Sheet
Cert. Number
*
Property
Year of Construction
Installation Cost (including parts, labour and VAT)
Total Cost €
Date of Works Completion
Date *
Estimation of System Performance Link
The latest version of the SEAI requirements require a link to the Estimation of system Performance report.
Link *

Requirements

Electrical Certs.
Safe Electric Certificate
Serial Number
Test Record Sheet
Cert. Number

Installation Details

Applicants Name - Name of person claiming the SEAI grant
Name
Installation Address
Address Line 1
Address Line 2
Town / City
County
Eircode
Installation MPRN
MPRN Number
Homeowner Name
Name
Installation Address
Address Line 1
Address Line 2
Town / City
County
Eircode

Test Report

This section is optional. If you wish, you can enter the information here for the Test Report section of the paperwork.

String 1 2 3
PV Generator Quantity
Protection Device (branch fuse) Type
Rated Value (A)
DC Rating(A)
Capacity(kA)
Wiring Phase Conductor (mm2)
Earth Conductor (mm2)
Testing and measurement of the string Voc(V)
Isc(A)
Irradiance
Polarity Monitoring
Array Insulation Resistance Test Voltage(V)
Pos - Earth (MΩ)
Neg - Earth (MΩ)
Earth Continuity (where fitted)
Switchgear functioning correctly
Inverter Serial Number Nb. only room for one serial number if more, use Notes below
Inverter functioning correctly
Loss of mains test
Note 1
Note 2

Generate Documentation

Based upon the information provided, click Generate Paperwork to download the completed forms.

If you wish to make any alterations, use the 'Back' button to go to the relevent section and return here to download the amended form.

If you are generating paperwork for several identical systems, you need only change the Installation Details on the previous page.

The name of the downloaded paperwork file includes the homeowner's surname to aid identification.

The last page contains links to the required datasheets and certificates.



Use the 'Finish' button to return to the start - note all system and installation information will be cleared.

Use this to provide an estimation of system performance for your SEAI grant application.
If the second orientation is not required, leave the panel information blank.
You have panels in the installation.


Orientation 1 Orientation 2


Estimated output for your site according to SEAI standards is  _ _ _ _ _  Kw Hrs per year.

To enter the results into your document, please click 'Accept'. Else click 'Cancel'.